291 sonucu aktar:
[ Yazar(Desc)] Başlık Tür Yıl
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z 
A
Aras, N., V. Verter, and T. Boyaci, "Coordination and priority decisions in hybrid manufacturing/remanufacturing systems", Production and Operations Management, vol. 15, no. 4: Wiley Online Library, pp. 528–543, 2006.
Aras, N., K. I. Altinel, and J. Oommen, "A Kohonen-like Decomposition Method for the Traveling Salesman Problem: KNIESDECOMPOSE", European Conference on Artificial Intelligence, pp. 261–265, 2000.
Aras, N., T. Boyaci, and V. Verter, "The effect of categorizing returned products in remanufacturing", IIE Transactions, vol. 36, no. 4: Taylor & Francis, pp. 319–331, 2004.
Aras, N., D. Aksen, and A. Gönül Tanuğur, "Locating collection centers for incentive-dependent returns under a pick-up policy with capacitated vehicles", European Journal of Operational Research, vol. 191, no. 3: Elsevier, pp. 1223–1240, 2008.
Aras, N., Y. Türkoğulları, Z. C. Taşkın, and K. I. Altinel, "Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals", Operations Research Proceedings 2012: Springer International Publishing, pp. 101–107, 2014.
Aras, N., K. I. Altinel, and J. B Oommen, "A Kohonen-like Decomposition Method for the Traveling Salesman Problem: KNIESDECOMPOSE.", ECAI, pp. 261–265, 2000.
Aras, N., and D. Aksen, "Locating collection centers for distance-and incentive-dependent returns", International Journal of Production Economics, vol. 111, no. 2: Elsevier, pp. 316–333, 2008.
Aras, N., M. Orbay, and K. I. Altinel, "Efficient heuristics for the rectilinear distance capacitated multi-facility Weber problem", Journal of the Operational Research Society, vol. 59, no. 1: Nature Publishing Group, pp. 64–79, 2008.
Aras, N., K. I. Altinel, and M. Orbay, "New heuristic methods for the capacitated multi-facility Weber problem", Naval Research Logistics (NRL), vol. 54, no. 1: Wiley Online Library, pp. 21–32, 2007.
Aras, N., K. I. Altinel, and J. Oommen, "A Kohonen-like decomposition method for the Euclidean traveling salesman problem-KNIES_DECOMPOSE", IEEE Transactions on Neural Networks, vol. 14, pp. 869–890, 2003.
Aras, N., KC. Özkısacık, and K. I. Altinel, "Solving the uncapacitated multi-facility Weber problem by vector quantization and self-organizing maps", Journal of the Operational Research Society, vol. 57, no. 1: Nature Publishing Group, pp. 82–93, 2006.
Aras, N., R. Güllü, and S. Yürülmez, "Optimal inventory and pricing policies for remanufacturable leased products", International Journal of Production Economics, vol. 133, no. 1: Elsevier, pp. 262–271, 2011.
Aras, N., D. Aksen, and M. Tuğrul Tekin, "Selective multi-depot vehicle routing problem with pricing", Transportation Research Part C: Emerging Technologies, vol. 19, no. 5: Elsevier, pp. 866–884, 2011.
Aras, N., S. Yumusak, and K. I. Altinel, "Solving the capacitated multi-facility Weber problem by simulated annealing, threshold accepting and genetic algorithms", Metaheuristics: Springer US, pp. 91–112, 2007.
Aras, N., G. Esenduran, and K. I. Altinel, Product-line selection and pricing with remanufacturing under availability constraints, , vol. 5583, pp. 244–255, 2004.
B
Bacaksızlar, N.. G., and N. Önsel, "Modeling the Dynamics of Methylmercury Biomagnification", 31st International Conference of the System Dynamics Society, 2013.
Bajgoric, N., K. I. Altinel, M. Draman, and A. Tamer Ünal, "Some aspects of using CASE tools in a Fusion-based application development project for production optimization", Industrial Management and Data Systems, vol. 102, pp. 463–471, 2002.
Bajgoric, N., K. I. Altinel, M. Draman, and A. Tamer Ünal, "Using Paradigm Plus CASE Tool in a Fusion-Based Application Development Project", Technology of Object-Oriented Languages and Systems, pp. 424–427, 1999.
Barlas, Y., and B. Gunduz, "Demand forecasting and sharing strategies to reduce fluctuations and the bullwhip effect in supply chains", Journal of the Operational Research Society, vol. 62, no. 3: Nature Publishing Group, pp. 458–473, 2011.
Barlas, Y., B.. Küçük, N. Önsel, and A.. S. Kocaman, Measurement, Analysis and Evaluation of Academic Publications and Citations, , no. FBE-IE-02/2008-02: Boğaziçi University, 2008.
Barlas, Y., and H. Yasarcan, "Goal setting, evaluation, learning and revision: A dynamic modeling approach", Evaluation and Program Planning, vol. 29, no. 1: Elsevier, pp. 79–87, 2006.
Barlas, Y., and H. Yasarcan, "A comprehensive model of goal dynamics in organizations: setting, evaluation and revision", Complex Decision Making: Springer, pp. 295–320, 2008.
Başdere, M., and Ü. Bilge, "Operational aircraft maintenance routing problem with remaining time consideration", European Journal of Operational Research, vol. 235, no. 1: Elsevier, pp. 315–328, 2014.
Başdere, M., N. Aras, K. I. Altinel, and S. Afşar, "A leader-follower game for the point coverage problem in wireless sensor networks", European Journal of Industrial Engineering, vol. 7, no. 5: Inderscience Publishers, pp. 635–656, 2013.
Başoğlu, İ., W. Hörmann, and H. Sak, "Optimally stratified importance sampling for portfolio risk with multiple loss thresholds", Optimization, vol. 62, no. 11: Taylor & Francis, pp. 1451–1471, 2013.
Baydogan, M. Gokce, G. Runger, and E. Tuv, "A Bag-of-Features Framework to Classify Time Series", IEEE Transactions on Pattern Analysis and Machine Intelligence, vol. 35, pp. 2796-2802, 2013.
Baydogan, M. Gokce, and G. Runger, "Time series representation and similarity based on local autopatterns", Data Mining and Knowledge Discovery, vol. 30, issue 2, pp. 476–509, 03/2016.
Baydogan, M. Gokce, and G. Runger, "Learning a symbolic representation for multivariate time series classification", Data Mining and Knowledge Discovery, vol. 29, issue 2: Springer US, pp. 400-422, 03/2015.
Beşikci, U., Ü. Bilge, and G. Ulusoy, "Resource dedication problem in a multi-project environment", Flexible Services and Manufacturing Journal, vol. 25, no. 1-2: Springer, pp. 206–229, 2013.
Beşikci, U., Ü. Bilge, and G. Ulusoy, Different resource management policies in multi-mode resource constrained multi-project scheduling, : Institute of Electrical and Electronics Engineers, Inc., 2011.

Pages